| Software Testing-
Duration : 45 days
Fees: 10000/-
contact immediately for special
offer
Annexure
1: Manual Testing
- 1.1.1 Introduction to Testing
- 1.1.2 Why Software testing
- 1.1.3 Quality Assurance Concepts
- 1.1.4 The companies providing software testing tools
1.2 Software Process
- 1.2.1 Software Development life cycle
- 1.2.2 Project Management
- 1.2.3 Requirement Management
- 1.2.4 Configuration Management
1.3 Testing
- 1.3.1 Software testing methods and methodologies
- 1.3.2 Software testing strategies
- 1.3.3 Testing Techniques
1.4 Software Testing Metrics
- 1.5 Testing Life Cycle
- 1.5.1 Test Plan Preparation
- 1.5.2 Test case design
- 1.5.3 Test Execution
- 1.5.4 Test Log
- 1.5.5 Defect Tracking
1.6 Reports
1.7 Web Testing
2: Automated Testing Tools-Win Runner
- 2.1 Win Runner
- 2.1.1 Introduction
- Gui Map
- Gui Map Editor
- Gui Files
2.1.2 Rapid Test Script Wizard
2.1.3 Recording
- Analog Mode
- Contest Sensitive Mode
2.1.4 Enchanting the Script
- Synchronization points
- Check Points
- Gui check points
- Bitmap check points
- Test Check points
- Data Base check points
- Data Driven Wizard
- Compiled Modules
- Exception Handling
- Regular expression
2.1.5 Running the Script
- Verify Mode
- Debug Mode
- Update Mode
2.1.6 Analyzing the Results
3: Automates Testing Tools Load Runner
3.1 Introduction to Load Runner
3.2 Introduction to Vugen
- 3.2.1 Recording the script
- 3.2.2 Running the script in Vugen
- 3.2.3 Analyzing the results
- 3.2.4 Creating a controller scenario using Vugen
3.3 Introduction to Controller
- 3.3.1 Exploring controller window
- 3.3.2 Creating a scenario using controller
- 3.3.3 Running the script in controller
- 3.3.4 Online monitoring
3.4 Scheduler
3.5 Analyzer
|